Construction setup 2026

Construction company setup in Dubai

A trade licence is half of it. Your Dubai Municipality grade decides which projects you can win.

  • DET licence plus Dubai Municipality
  • DM grade caps your project size
  • A qualified engineer per activity
  • 100% foreign ownership
WhatsApp a specialist
15+ years10,000+ engagements4.8 Google, 163+ reviewsISO certified

Contracting, licensed

What does construction setup involve?

A construction company in Dubai needs a DET trade license for a contracting activity, plus a Dubai Municipality classification that grades the size and height of project you can take.

A license alone does not let you bid; the classification does.

From 8 January 2026, both sit under one unified contractor register under Dubai Law No. 7 of 2025.

DET + DMTwo authorities license you
GradeCaps the projects you can win
100%Foreign ownership, most activities
First fork

Contractor or engineering consultant, which license?

Two separate licenses. A contractor builds; a consultant designs and supervises. Under Law No. 14 of 2025, one firm cannot do both on a job.

FactorContractorEng. consultant
What you doBuild the worksDesign and supervise
License typeContractingProfessional
DM classificationContractor gradeEngineer grade + SOE
Ownership100% mostProfessional, LSA case
Key staffEngineer + laborersRegistered engineers
Same projectOne role onlyCannot also contract

The mechanic that decides your projects

How contractor classification works in Dubai

Dubai Municipality grades every contractor by the scale of building it can take on.

Your category is a ceiling, not a label

Dubai Municipality grades contractors by building height and project scale. The entry point is G+1, ground plus one floor. The top is the Unlimited category. Foreign-company branches must apply for the Unlimited category.

New companies start at the bottom

You begin at the lowest category and move up by proving completed projects, registering more senior engineers, the top tier expects 10-plus years of UAE experience, and showing the financial capacity DM asks for at each step.

The wrong category caps revenue or voids a bid

Bidding above your category gets you disqualified, and under Law No. 7 of 2025 exceeding your classification limits is a penalised violation. Under-classifying is quieter but costs you.

Dubai contractor classification from G+1 to Unlimited

G+1

Entry category, up to two storeys, rising to Unlimited for any height

What changed in 2026

The unified Dubai contractor register

From 8 January 2026, Dubai Law No. 7 of 2025 puts every contractor on one Dubai Municipality register.

Dubai's business district at dusk, seen from above

Law No. 7 of 2025

Dubai Municipality

HIGH RISK

Law No. 14 of 2025

Dubai Municipality

HIGH RISK

Federal Decree-Law 25 of 2025

UAE Federal

MEDIUM RISK
Choose your activity

Construction license types in Dubai

Dubai issues contracting licences by activity, and the one you pick sets your classification path and approvals.

Confirm my activity
Dubai contracting license activities on a file
  • Building Contracting

    Villas, warehouses and buildings up to your classification grade.

    Best for
    General contractors building structures.
    Key consideration
    Grade caps the building height you can take on.
  • Civil Works

    Roads, drainage, sewerage and infrastructure works.

    Best for
    Infrastructure and government-project contractors.
    Key consideration
    Often needs civil engineers and a project portfolio.
  • MEP / Electromechanical

    Mechanical, electrical, plumbing, HVAC and fire systems.

    Best for
    Specialist electromechanical contractors.
    Key consideration
    A specialist classification, separate from building.
  • Demolition & Landscaping

    Controlled demolition and outdoor and landscape works.

    Best for
    Specialist trade contractors.
    Key consideration
    Demolition carries added safety approvals.
  • Building Maintenance

    Repair, upkeep and technical maintenance of properties.

    Best for
    Maintenance and technical-services firms.
    Key consideration
    A lighter grade than main contracting.
  • Activity sets your grade path
  • DM classification required
  • One engineer per activity
  • Government tenders need mainland

Not sure which activity fits?

Tell us what you build and we will confirm the contracting activity, the classification path and any approvals it triggers.

Confirm my activity

Which is right for you

Mainland or free zone?

For most contractors, mainland: government and most private projects need a mainland licence and DM classification.

Best for contractors
MainlandDET plus DM
Free zoneZone authority
Foreign ownershipWho holds the shares
100% on most activities
100%, always
Government tendersDubai Tenders Portal
Eligible to bid
Needs a mainland structure
Mainland projectsWork across Dubai
Direct, no restriction
Limited without a branch
DM classificationUnder Law 7 of 2025
Via the unified register
Also via the register now
OfficePresence requirement
Ejari office or warehouse
Flexi-desk options
Visa capacityResidence visas
Scales with premises
Capped by package
Entry costTypical first year
Higher
Often lower to start
Best for
Contractors bidding on Dubai government or private mainland projects.
Engineering consultancy, design and turnkey work aimed at export or specific developments.
The honest verdict

If you build on mainland projects or bid for government work, mainland is the route. Free zones suit consultancy, design and turnkey-export work.

Straight answers

What construction actually requires

The load-bearing requirements founders miss until a project stalls.

Myth

Construction needs a 51% local partner

Reality

100% foreign ownership on most contracting activities since 2021, under Federal Decree-Law No. 32 of 2021. Check the positive list.

Myth

A trade license lets me start building

Reality

No. You also need Dubai Municipality classification, and each project needs its own building permit before work starts.

Myth

Any engineer on the license counts

Reality

At least one qualified engineer per activity, DM-registered and a member of the UAE Society of Engineers, is mandatory.

Myth

Insurance is optional at the start

Reality

Contractor's All Risk applies, and the Civil Code holds you liable for structural defects through decennial liability.

Myth

A consultancy can also be the contractor

Reality

Not on the same project. Law No. 14 of 2025 adds a conflict-of-interest bar between consulting and contracting.

Myth

A free zone contractor is tax free

Reality

Qualifying income only. Corporate tax of 9% above AED 375,000 applies to most contractors, and building work is not VAT zero-rated.

The load-bearing requirements founders miss until a project stalls.

Real ranges

How much does it cost to set up a construction company in Dubai?

Basic contracting licensing starts around AED 25,000 to 30,000; a classified contractor runs higher. 2026 planning ranges.

Entry category (G+1)

Entry-grade contractor

Basic license plus the lowest classification, a small office, minimal visas. The cheapest way in.

DET contracting license
G+1 classification
One engineer on file
Unlimited category

High-grade contractor

Top classification for high-rise and infrastructure, multiple senior engineers, larger financials.

Unlimited classification
Multiple senior engineers
Larger financial capacity

Not sure which grade is genuinely worth targeting?

Tell us the projects you want and we return an itemized quote by grade, renewal included.

Government fees (trade name and initial approval, the contracting license, DM classification) are separate from your office or warehouse, the engineer, insurance, and visas, and from our service fee. A low headline that leaves out classification, an engineer or insurance is not cheaper, it is incomplete.

The process

How to set up a construction company in Dubai

An unclassified trade license takes about two weeks. A classified contractor takes 6 to 12 weeks: classification follows the license.

  1. Critical stage

    Confirm activity and target grade

    Pick the contracting activity and the classification grade your projects need.

  2. Reserve trade name and initial approval

    Submit name options that follow UAE naming rules and match your activity.

  3. Register the entity and premises

    Set up the LLC or branch and sign the Ejari office or warehouse lease.

  4. Issue the DET contracting license

    Submit the MOA and documents, pay the fees, receive the trade license.

  5. Critical stage

    Classify with Dubai Municipality

    Register your engineer, then get the DM classification that sets your grade.

  6. Register on the contractor register

    Complete registration under Law No. 7 of 2025 on the Invest in Dubai platform.

  7. Open a corporate bank account

    Prepare the file and open the account once the license is issued.

  8. Critical stage

    Establishment card and visas

    Get the establishment card, then process investor and staff visas.

What you bring

Documents for a construction licence

For a construction license file6 items
  • Passport copies of the shareholders and the manager
  • Trade name options and your chosen contracting activity
  • MOA for an LLC, or parent-company documents for a branch
  • Ejari office or warehouse tenancy agreement
  • Your engineer's degree, experience and Society of Engineers registration
  • Attested foreign documents where a shareholder or parent is overseas
Full document checklist
Documents for a Dubai construction license on a desk
Why DMCS

Construction setup, handled in sequence

Classification, engineer registration and site approvals all have to line up in order. We run the full sequence.

  • Right setup strategy

    We match your structure, license and target grade to the projects you want.

  • Approvals in order

    License, then classification, then the unified register, sequenced so nothing stalls.

  • Engineer registration

    We handle the DM and Society of Engineers registration your grade depends on.

  • End to end

    From license to your first project approval, one desk owns the sequence.

  • Since 2009Filing mainland setups in Dubai
  • 15+ yrsOn the Dubai mainland
  • 10,000+Client engagements
  • 50+Industries served
Get a fixed quote for your construction setupTell us your activity, target grade and premises for an itemized figure.
Get a fixed quote

Real results from our clients

What our clients say about working with us

Real Google reviews from founders we have set up and kept compliant on the Dubai mainland.

DMCS.

Dubai Mainland Company Setup, by the team behind Riz & Mona

163+ Google reviews

Write a review

FAQ

Frequently asked questions

Basic contracting licensing starts around AED 25,000 to 30,000. A classified contractor runs higher in year one once you add Dubai Municipality classification, a registered engineer, an office, insurance and visas. Your grade is the biggest variable, so ask for a quote by grade.
Contractor classification is Dubai Municipality's rating of your company by building height and project scale. Your grade is a ceiling: it sets the project size you can legally win. Entry is G+1 (ground plus one floor); the top is Unlimited, for any height. A trade license alone does not let you build.
Yes, for most mainland contracting activities under Federal Decree-Law No. 32 of 2021, with no local partner required. A small set of activities is the exception, so confirm the ownership rule against your specific contracting activity before you commit to a structure.
A contractor builds the works; an engineering consultant designs, obtains approvals and supervises. They are separate licenses with separate Dubai Municipality classifications, and since Dubai Law No. 14 of 2025 one firm generally cannot act as both the consultant and the contractor on the same project.
Yes. Dubai Municipality requires at least one qualified engineer per licensed activity. The engineer must be DM-registered and a member of the UAE Society of Engineers, and higher classification grades require more senior engineers with more years of experience.
For most contractors, mainland, because government and most private mainland projects require a mainland contracting license and Dubai Municipality classification. Free zones suit engineering consultancy, design and turnkey-export work. Since the 2026 unified register, classification applies to both routes.
An unclassified trade license takes about two weeks. A fully classified, operational contractor takes 6 to 12 weeks, because Dubai Municipality classification sits after the license and depends on registering your engineer first.
Dubai Law No. 7 of 2025 regulates contracting and took effect on 8 January 2026. It puts every contractor in Dubai, including free zones and DIFC, on one unified Dubai Municipality register with mandatory classification. New companies register from day one; existing ones have until 8 January 2027 to comply.
Yes, a mainland contractor with the right Dubai Municipality classification can bid on government and semi-government projects through the Dubai Tenders Portal, within its grade. Free zone entities generally need a mainland structure to bid on government work.
Corporate tax is 0% up to AED 375,000 and 9% above, under Federal Decree-Law No. 47 of 2022. VAT is 5%, and construction on a UAE building is generally not zero-rated, even for a foreign client. A free zone contractor reaches 0% corporate tax only on qualifying income under strict conditions.

Get your construction setup quote

Tell us your contracting activity and your target grade. We confirm the license route, the classification path, and an itemized quote with renewal included. No obligation.

WhatsApp Us
No obligationTransparent pricing, zero hidden fees100% privacy guaranteed
WhatsApp

Free consultation

Talk to a mainland setup specialist about your exact requirements. No obligation.

100% privacy guaranteed. We reply within one working day.